DISCONNECT BETWEEN RECORDS AND REALITY
Things came to a boil in December 2011, when a sagging power-supply rail – called the third rail – caused two massive breakdowns. Commuters were stuck on at least one train without lights or air-con.
The incidents on Dec 15 and 17 triggered a Committee of Inquiry (COI), which found, among several other things, that train wheels were not properly maintained and had many flat spots. This caused undue vibration when the trains were in motion, which was thought to have contributed to the third rail dislodging.
In its 358-page report, the COI stated that there “appeared to be a gaping disconnect between what was formally on record and what was happening on the ground”.
“It was particularly difficult to reconcile the seemingly robust maintenance regime with the failure of a significant number of items,” it stated.
Going by recent events, it would seem that the lessons of 2011 – hammered home by the COI, which lasted six weeks – have not yet fully sunk in. For instance, plans to inform commuters of the severity of each delay, how long it will actually last, and when the next train will arrive will be rolled out only next year – six years after the COI noted that “passengers do not always trust the information they are given” today.
If things are not put right soon, this distrust may well spread. Here, the state of the New York City subway is a cautionary tale we cannot ignore.
The city had essentially made the mistake of relying too much on its engineering measure of reliability – of how many kilometres trains clock before a delay occurs – and not paying more attention to what was actually happening on the ground.
In a scathing editorial on Oct 21, the New York Times opined that the subway crisis boiled down to bad decisions made by politicians – “all of whom ride the subway about as often as they publicly admit error”.
The amount of funds they diverted away from what the system needed to cope with age and rising ridership was the main reason for its latest downward spiral.
“You can shortchange the system only so much and get away with it,” the editorial noted.
GETTING BACK ON TRACK
To be fair, Singapore has done much to try to put its rail system back on track of late. On a national level, transport budgets have grown considerably, largely because of new rail projects.
SMRT has been delisted. It is now fully owned by Temasek, and by virtue of that, the Government.
The Government, in the form of the Land Transport Authority (LTA), now owns all of its assets. This, hopefully, will lead to more timely replacement and upgrading in the future.
For things which should have been replaced more than a decade ago, Singapore is putting pedal to the metal. The third rail on the North-South and East-West lines have been changed out. And all the sleepers have been replaced.
Hence, there are no more breakdowns attributable to these two sets of components anymore.
When the signalling system upgrading is done by the middle of next year, signalling-related delays should go the same way, too. Hopefully, the LTA, which appointed signalling contractor Thales to do the job, can first ensure that there are no more flaws such as the ones which led to the Nov 15 collision.
There are a number of other parts which need changing or upgrading, including power cables, tracks and the trains themselves. All these will take up to 2024.
It is a long time for commuters to wait – 13 years, if you count from 2011. It goes to show that if you neglect a system, making it right again is doubly hard.
But make it right again we must. Any effort to shorten the timeline would not be a bad thing either.
To that end, SMRT and the LTA should hire more people who can do the work, even if it means going beyond our shores to do so.
As for the workers (or supervisors) who are impeding progress, clearly efforts must be made to identify and reform them. Failing which, they must be dismissed, like those who were recently found to have falsified maintenance logs for the anti-flooding system.
Last, but not least, the people who work for SMRT – or for that matter, SBS Transit, which runs the North East and Downtown lines – must be empowered. They must feel that what they do or decide makes a difference. And the corporate culture cannot be such that workers take the heat when things go wrong, and bosses bask in glory when things go right. It is Management 101.
SMRT’s new chairman, Mr Seah Moon Ming, seemed to be showing the way when he bowed to apologise for the Oct 7 tunnel flooding. It is too early to say how his values will permeate the ranks, but the man offers a glimmer of hope.
If everything falls into place, there is no reason why our MRT cannot be among the best – if not the best – in the world. And not just from an engineering point of view, but going by the actual experience of the people who currently make 3.3 million train trips a day.